Msi GE70 APACHE PRO Manual de usuario Pagina 28

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 48
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 27
Getting Started
3-4
Installing the Battery Pack
1. Locate the steady gutter of the battery pack, and the battery bolt on the battery tray as
shown below.
2. Align the steady gutter and battery bolt with correct orientation and make sure they are
joined properly.
3. Overturn the battery pack with the direction shown below.
4. Press down the battery pack to fasten the battery pack in the battery tray.
5. Press the lock/unlock button to the Lock position to make sure the battery pack is
securely fastened.
Vista de pagina 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 47 48

Comentarios a estos manuales

Sin comentarios